Internal Glass Sheathing

Minggu, 31 Oktober 2010

The two halves now fully sheathed in glass




The resin is added and once again the cedar shows through the glass.





The glass cloth gets laid out along the inside of the hull and deck.







Cleaning up the inside of the kayak ready for sheathing.



Separating the deck from the hull became something of a problem for several hours, as some epoxy had found its way down from the deck to glue the two halves together too soon!
Once separated, the glue from joining the strip planking together must be removed.


Related Posts by Categories

0 komentar:

Posting Komentar