Sailing Canoe "Swift"

Minggu, 21 Maret 2010

First sail of the season

























First sail (and swim!) of the season. It's a long time since the canoe was in the build stage in the workshop (see earlier posts) so fitting in a first sail in March has got 2010 boating off to a good start. It also made a nice change from the current maintenance work and stripping down antifouling in the boatyard. It is a great deal more picturesque and better for the lungs).







New crew





Read More..

Making Paddles

Minggu, 21 Februari 2010

Time for a pair of single paddles for Swift


The excellent book by Warren and Gidmark provides some good tips and offsets to mark out various designs. I choose the 'Sugar Island' design and glue up blanks in Ash, with some mahogany decorative stripes and protective strip glued accross the end grain.


The blanks are marked out from a centre line, measuring out to each offset dimension and then joining up the points with a clean curve.



The next job was to cut out the profile in plan.

I will revert to imperial measurements as that's what provided in the design book. So the blanks were glued up to an even thickness of 1 1/4" (being the maximum thickness of the stocks). As the paddles will only be 3/8" at most there is plenty of waste. I choose to router the worst of this off before hand planing.

There is still plenty to go at with a smoothing plane, block plane and spokeshave. Once I have my 3/8" thickness (9 mm) in the centre and paddle endges which are shaped down to 3/32" ('say' 2.5mm) I move onto the opposite end and start to shape the grip.




The candle on the bench was left over from a wedding reception and keeps the bottom of the planes moving well over the timber!


Most of the shaping on the stock and grip is completed with a sharp spokesave and the Ash works relatively easily.

The finished grip.


And the finished product! The double paddle made at the same time as Swift last year was varnished, so I will try oiling these ones and see which proves to be the most practical finish.



Read More..

Completion

Minggu, 06 Desember 2009

Sails Up!


An almost invisible repair complete, so back in business for some winter sailing on a very flooded welsh lake.





Passes inspection from wife - declared seaworthy.
Read More..

Launch Day

Sabtu, 17 Oktober 2009

Launch day finally arrives


















Weather and launch went perfectly, the sails for the Gunter rig set the Iain Oughtred designed MacGegor canoe off perfectly. I remained the right way up and out of the water for the duration and 'Swift' lived up to her name.
Nothing of course ever quite ends as planned in boatbuilding and my reluctance to risk damaging the varnished deck by over strapping the canoe down to the trailer was to have disastrous results. 'Swift' I noticed (after the launch) had damage to her hull, where she had lifted and must have slammed down onto a point load on the trailer rollers. I have now learnt a difficult lesson in this respect and boat building has now instantly moved to boat repair.
On a more positive note, she is a fine little boat and once over this frustration and what we intend to be an invisable repair, I'm now up for some winter sailing.


How could I let this happen.

Read More..

Sails Up











Read More..

A boat trailer for Swift

Minggu, 13 September 2009

Checking the masts still fit



Introducing the 'lightweight' trailer. Two thirds of the way through the build I finally accepted the canoe was not going to be a car top model (it had grown too heavy!). We designed a trailer and went to a local agricultural engineer for the chasis to be welded up. A fine trailer it is, but the theme of heavy has continued with this element of the project. So trailer replaces roof rack and tractor may now be added to the canoe accessory list.

Wheels, loading rollers and towbar, all bolted on.



In case this entry gives the impression all is complete and ready for launching, not quite. Some annoying runs in the deck varnish now need rubbing out and further coats of varnish applied. Also some further fitting out yet.
Read More..

Paint & Varnish

Minggu, 06 September 2009

Work continues to shape the cockpit coaming (laminated in Ash)



The first coat of varnish on the deck (the hull is protected from splashes by a curtain of newspaper!)


Both the outsde and inside of the hull painting is now complete



Read More..