Launch Day

Sabtu, 17 Oktober 2009

Launch day finally arrives


















Weather and launch went perfectly, the sails for the Gunter rig set the Iain Oughtred designed MacGegor canoe off perfectly. I remained the right way up and out of the water for the duration and 'Swift' lived up to her name.
Nothing of course ever quite ends as planned in boatbuilding and my reluctance to risk damaging the varnished deck by over strapping the canoe down to the trailer was to have disastrous results. 'Swift' I noticed (after the launch) had damage to her hull, where she had lifted and must have slammed down onto a point load on the trailer rollers. I have now learnt a difficult lesson in this respect and boat building has now instantly moved to boat repair.
On a more positive note, she is a fine little boat and once over this frustration and what we intend to be an invisable repair, I'm now up for some winter sailing.


How could I let this happen.

Read More..

Sails Up











Read More..