Completion
Minggu, 06 Desember 2009
Read More..
Diposting oleh
karminao
di
10.28
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Launch Day
Sabtu, 17 Oktober 2009
Launch day finally arrives
Weather and launch went perfectly, the sails for the Gunter rig set the Iain Oughtred designed MacGegor canoe off perfectly. I remained the right way up and out of the water for the duration and 'Swift' lived up to her name.
Read More..
Weather and launch went perfectly, the sails for the Gunter rig set the Iain Oughtred designed MacGegor canoe off perfectly. I remained the right way up and out of the water for the duration and 'Swift' lived up to her name.
Nothing of course ever quite ends as planned in boatbuilding and my reluctance to risk damaging the varnished deck by over strapping the canoe down to the trailer was to have disastrous results. 'Swift' I noticed (after the launch) had damage to her hull, where she had lifted and must have slammed down onto a point load on the trailer rollers. I have now learnt a difficult lesson in this respect and boat building has now instantly moved to boat repair.
On a more positive note, she is a fine little boat and once over this frustration and what we intend to be an invisable repair, I'm now up for some winter sailing.
Diposting oleh
karminao
di
13.25
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Sails Up
Diposting oleh
karminao
di
12.16
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
A boat trailer for Swift
Minggu, 13 September 2009
Checking the masts still fit
Read More..
Introducing the 'lightweight' trailer. Two thirds of the way through the build I finally accepted the canoe was not going to be a car top model (it had grown too heavy!). We designed a trailer and went to a local agricultural engineer for the chasis to be welded up. A fine trailer it is, but the theme of heavy has continued with this element of the project. So trailer replaces roof rack and tractor may now be added to the canoe accessory list.
Diposting oleh
karminao
di
10.50
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Paint & Varnish
Minggu, 06 September 2009
Read More..
Diposting oleh
karminao
di
13.57
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Deck & Lee Board
Minggu, 16 Agustus 2009
Read More..
Diposting oleh
karminao
di
23.00
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Setting out the sails
Sabtu, 18 Juli 2009
The paddle blanks glued and starting to shape up in sitka spruce with decorative mahogany 'stripes'.
Read More..
Diposting oleh
karminao
di
14.20
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Seats & Brass Stem
Minggu, 31 Mei 2009
Shaping and positioning the seats. These have a number of alternative positions forward and aft and also need to fit in with the position of the steering foot pedals, (plenty of measuring and trying out, before we finally commit ourselves!)
Read More..
Diposting oleh
karminao
di
12.13
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Deck Beams, Carlins & Spars
Minggu, 10 Mei 2009
Deck Beams and Carlins complete, watertight (or will be) box surrounding mast step.
And now for some spar making, in best quality Sitka Spruce (and most of it ends up as shavings).
Fitting the sheeve blocks in the top of both masts.
Read More..
And now for some spar making, in best quality Sitka Spruce (and most of it ends up as shavings).
Fitting the sheeve blocks in the top of both masts.
Diposting oleh
karminao
di
12.21
0
komentar
Kirimkan Ini lewat Email
BlogThis!
Bagikan ke X
Berbagi ke Facebook
Langganan:
Postingan (Atom)